Projects
ABOUT
EN
CZ
Waterponding analysis
Scope:
Consulting engineering on the ETFE cushion to assess the impacts of water ponding in a deflated cushion in the event of an air-supply failure
Country:
USA
Client:
Structurflex LLC
Architect:
Gensler
Size:
3000 m
2
of ETFE cushions
Photo:
bpl-cz
Partner:
LEICHT
Transient dynamic solver with time-dependent hydrostatic load (increasing from 0) and snow load (decreasing to 0)